One Contract. A Complete, Compliant Production Line.
The line, the wastewater treatment, the ventilation and the automation — designed, fabricated and commissioned by the same team, under the same contract.
What “Turnkey” Means at EVESS
Technical Brief & Requirements Gathering
We collect your process requirements, site conditions, capacity targets, and regulatory obligations to define the project scope.
Engineering & Documentation
Our engineers develop full design documentation: P&IDs, 3D layouts, equipment specs, and control system architecture.
Equipment Manufacturing
All components are manufactured in-house using CNC machinery and chemically resistant polymer fabrication.
On-Site Assembly
Our installation team handles full on-site mechanical and electrical assembly according to the approved design.
Commissioning & Testing
We conduct full commissioning tests, parameter tuning, and operator training before formal handover.
Final Acceptance & Handover
Formal project acceptance with as-built documentation, warranty certificate, and ongoing service agreement.
Scope Matrix
| EVESS Turnkey Contract | Typical Split Contracts | |
|---|---|---|
| Line design & fabrication | Included | Included |
| Wastewater treatment (ETP) | Included, same contract | Separate contractor |
| Ventilation & scrubbing | Included, same contract | Often separate |
| PLC/SCADA automation | Engineered in-house | Often third-party |
| Single point of accountability | Yes | No — multiple suppliers |
| FAT/SAT commissioning | Included | Varies by contractor |
Why Splitting Line and ETP Contracts Fails
When the process line and the wastewater treatment plant come from different suppliers, responsibility for compliance splits too — and so does the incentive to get the interface between them right. A single accountable contract means the line's discharge, the ETP's intake, and the plant's automation are engineered together from day one.
FAQ
Manual lines suit small-batch or prototype production with 1–2 operators per shift. Semi-automatic lines automate transport while keeping operator-guided process steps, for medium volumes. Automatic lines run continuously under PLC/SCADA control with only supervisory staffing, for high-volume manufacturing.
Send your part drawings and throughput
Receive a scope and budget frame within 48 hours.