Automotive Components
Automatic Zinc-Nickel Plating Line for a Tier-1 Supplier
The Task
Replace a manual plating process that could not hold consistent coating thickness across high-volume fastener production.
Scope Delivered
Automatic electroplating line — zinc-nickel process
Integrated wastewater treatment plant
PLC/SCADA control with recipe management
Local exhaust ventilation
Key Numbers
—Process tanks
—Line length
—Rectifier capacity
—Effluent capacity
Result
Placeholder result summary — to be replaced with the verified outcome (rejection-rate change, throughput, compliance result) once project data is confirmed.