Illustrative example — pending verified project data
Automotive Components

Automatic Zinc-Nickel Plating Line for a Tier-1 Supplier

The Task

Replace a manual plating process that could not hold consistent coating thickness across high-volume fastener production.

Scope Delivered

Automatic electroplating line — zinc-nickel process
Integrated wastewater treatment plant
PLC/SCADA control with recipe management
Local exhaust ventilation

Key Numbers

Process tanks
Line length
Rectifier capacity
Effluent capacity

Result

Placeholder result summary — to be replaced with the verified outcome (rejection-rate change, throughput, compliance result) once project data is confirmed.

Need a similar line for your plant?

Engineering review within 48 hours.